This project started out with a simple 100 x 100 Box Frame to hold 100mm EUROBOND insulated panels. Once we installed the Frame the Contractor in question approached us to install the EUROBOND panels, Kee Clamp Handrail and a Steel Cat Ladder. 

The cat ladder was fabricated in our Workshop in Ardee. 

ADCO was the Principal Contractor on this project. 