top of page

MSD
This project started out with a simple 100 x 100 Box Frame to hold 100mm EUROBOND insulated panels. Once we installed the Frame the Contractor in question approached us to install the EUROBOND panels, Kee Clamp Handrail and a Steel Cat Ladder.
The cat ladder was fabricated in our Workshop in Ardee.
ADCO was the Principal Contractor on this project.






bottom of page